Here we are constructing a bedroom addition which will be a 17' x 21' one story addition.

Status: Day 2 - Excavating the site for the foundation.

Status: Day 3 - Excavating the site. Starting on formwork

Status: Day 4 - Drilling Pilings
Status: Day 5 - Installed the Rebar for the beams and the footings
Status: Day 6 - Pouring pilings, Installing brick ledge, installing moisture barrier and mesh wire.  Also installed dowel bars to tie into the existing slab.
Status: Day 7 - Pouring the slab